Thursday, May 22, 2008
Monday, May 12, 2008
Monday, May 05, 2008
The solution was a two-level operation. This required construction of additional piers. A photo of the prototype will be attached to this post in the next few days. The prototype has been disasembled to improve the property.
Friday, May 02, 2008
Pool Lake is now sparklig and ready for a summer of recreation. We are expecting full enjoyment by all the assistant engineers and their families.
Tuesday, April 29, 2008
1) An unexplained uncoupling occured in the upper tunnel. While attempting to push the cars involved, the cars were derailed. Plans are to dispatch the crane this evening.
2) Problems continue in the lower tunnel with the Santa Fe F3 bogging down.
3) Construction of the yard spur needs to continue.
4) The engineers are considering options for the upper loop extension.
Monday, April 21, 2008
One crisis is the questionable structure of the upper loop. Engineers are suggesting that the last electrical modification for the track resulted in the need for the acquisitions of an additional small strip of property on the north end. This will require significant structural changes to the upper loop as well.
In the yard, work stopped on the last spur. The uncoupling track requires significant electrical connections. There are also questions about the proper way to install road bed around the curves.
More work is also required for warehousing of materials and tools.
At the next board meeting, we must consider whether to hire additional assistant conductors. There are two candidates currently under consideration in addition to the one already hired. Ava has not been available the last few weeks. Sarah and Mikie are the candidates under consideration.
Tuesday, April 15, 2008
Ironically, the skies are now blue instead of a dusty brown.
Yesterday we were able to perform some maintenance on our passenger car named Summit. It was cleaned. The maintenance department degreased the wheels, improving the electrical connections to the interior lights. The maintenance department determined we did not have the resources at this time to properly repaint the outside of the coach.
The marketing department is insisting that the board determine a name for the rail line. The following were submitted for consideration:
G&A Railway
D-FC Lines
AVA Express Company
Revenue is now being generated by providing the following services:
Sightseeing tours to Summit Station - historic steam or diesel
Milk production
Gravel mining
Lumber transfer and transportation
Military support
Auto transport
Future revenue streams:
Over sized document handling
Inter modal transfers
Location and geography description:
The G&A Railroad is nestled in Summit Valley at the foot of Summit Mountain in northern Wisconsin. To the north is Canada. In order to ascend from the valley floor to the foot of Summit Mountain, engineers followed the Petrified River. Two tunnels were required to complete the connection. From the foot of Summit Mountain, a bridge is planned to span the gorge to the west for connection to the city of Desque. This will provide access to markets in Minnesota. The upper tunnel was needed to provide this connection as well as a station at Summit for sightseeing tours and future lodging. the lower tunnel provides a connection to the east. To the east is our connection to the Chicago Northwestern mainline to Greenbay.
Summit Valley provides room for a yard and a few industries developed on railroad property to support the railroad. These industries include a dairy farm and a gravel pit. The gravel pit was started to provide roadbed and ballast for the railroad but then became a lucrative operation in its own right. The dairy farm was a natural fit because of the readily available pastures and the inheritance of the necessary railroad equipment to support the business.
Tuesday, April 01, 2008
Monday, March 31, 2008
The yard loop has some troubles.
1) The Steam locomotive does not like crossing the milk platform. Yaws crazily and stalls.
2) More roadbed is needed
3) Clearance is a big problem on the south end of the curb.
4) A good option may be to take out the second 1/2 uncoupling track and shorten this section. The uncoupling track could work well on the middle siding. Need to look at operational issues. the south siding is just right to park the diesel. More temptation to make an engine shed here.
I am not sure how the geometry of the loop would change if I shorten it up. I suspect things will improve.
5) wiring changes are need for the uncoupling track for the north siding. Color codes need to match. I need to procure some more 18 ga. green wire.
Sunday, March 30, 2008
Also made some significant progress on the yard. The runaround track is in place (not yet balasted or secured. Power to two of the three sidings. I also found two of the three remote switches requied.
Straighened up the wire morass under the layout with zip ties.
Had to superglue the RR Crossing sign for the Automatic Gateman accessory due to an accident by my assistant. I also need to ask my assistant where all my logs are. I am missing at least nine. Found one in the living room.
Found the rotating beacon tower. Also spottted some additional O roadbed.
Direct wired a remote uncoupler/unloader track for the milk platform. Everything seemed to be working fine, but now after attaching it, the unloader button does both the uncouple and unload functions! This may not be all bad?
Friday, March 28, 2008
Thursday, March 27, 2008
1) plastic skid slides under the table legs to protect the floor and raise it a bit so the plastic drawers on wheels will fit underneath.
2) lowered cross braces to 60 scale feet above the floor.
3) installed shelves across braces
4) Did some major cleanup of the room
Also tried to create 1/2 track uncoupling track from salvaged tracks purchase last week
1) The jig saw worked great to cut the track
2) Had trouble with the solderless connector shorting out between the uncoupler terminal and the powered middle rail
3) Also had trouble with the insulating material on the middle rail
4) Exchanded wires for properly color coded types
5) Project completion put on hold... This is delaying yard cleanup.
Purchased another can of spray foam for scenery work.
Wednesday, March 26, 2008
The upper and lower loops are again functional. Wiring for the upper and lower loops now has dual feeds for consistent voltage delivery.
The upper loop now has a passenger terminal with lighting. The platform was extended to match the curve radius. The lighting is controlled remotely with an LED equiped toggle switch. Ava approves.
Significant utilitiy upgrades below grade include a new main power cut off and better wire management with labels. The power distribution block was upgraded from 8 to 16 terminals.
Roadbed on the lower loop upgraded from HO to O for a much better look.
The CNW NW switcher took a few rounds with little change in speed.
The coal dump car is still having trouble at switches. It will probably need a sliding shoe replacement.
Wednesday, March 19, 2008
1) removed mountain to create isolation in upper loop. this was accomplished by purchasing two short isolation tracks. The geometry then required the purchase of a third short piece.
2) Removal of the mountain provided an opportunity for a base coat of color. Our dirt has changed from white to brown.
3) This provided an opportunity for carving out the waterfall feature. A steel girder bridge was ordered too bridge the chasm (maybe 40 feet).
4) Installation of one of the lower tunnel portals was accomplished today. More block work is required inside the tunnel.
5) We received a shipment of three uncoupling tracks that can be converted to half tracks for the yard.
6) Two priorities emerged: complete block wiring with a cleanup of wiring strategy and color coding; AND create an underground storage area.
Operations are halted for three days. There may be some opportunity Friday night for some clean up.
Friday, March 14, 2008
Just when we thought the engineering work was done, I discovered that the yard can have a runaround loop which only increases its capacity! Last night we began some major re-engineering.
1) Removed two switch at the yard entry and replaced with steady voltage wired switches. The switches are installed but not yet powered or tested.
2) Replaced the uncoupling track on the mainline with an uncoupling track/operating track combo. This will give flexibility in delivery points and permit use as a test track.
3) Re-installed manual switch for short engine siding in yard.
4) Installed bumpers at ends of spurs
5) Installed isolation pins where required except that the outer spur siding requires a block isolation pin.
6) Purchased a flex track operating section for the upper section. This will allow for a dump action from the upper level ramp to the lower level yard track.
Wednesday, March 12, 2008
The next innovation was to run the two diesels together. They worked well together. Once they became unsyncronized (in the tunnel!). The pulled the longest possible load up the hill nicely. We added one too many cars and actually ran into ourself on the tighter bottom reverse loop. Great fun.
I am toying with the idea of two-train continual operation. It will require additional blocks (about 11 total). The alternative is to use the two-throttle capabilites to control speed on the lower and upper loops.
I am starting to feel cramped. I want to be able to switch from one consist to another and to store all the cars at the end of the day. I will likely store some cars to make room until I launch into the bridge phase of the project.
I planted a dead tree today. It looks good. I need to find the tree it came from and get some more. I also want to do some rural driving and see if my favorite weeds are up yet.
Tuesday, March 11, 2008
Monday, March 10, 2008
Roling stock is still arriving (air lifted in). It is an odd mixture of what is available. Most is useful for construction. There is even a passenger car for the comfort of workers. A roster will be required to set up scheduling and determine how units will be used for operations. Most of the inventory requires repair since a lot of it is 30 to 50 years old. This weekend we were able to purchase some much-needed parts:
springs and pivot rivets for couplers
ladders for one caboose
an additional 260 bumper
a much-needed upgraded power supply (ZW)!
Also, two new units were purchased a Sante Fe A-unit diesel and a coal-dump car. The engine required significant cleaning, expecially the horn unit. The engine was also fouled with grease and everything needed lubrication. It runs great now. There is some minor concern about scraping the undercarriage on turnouts.