Monday, May 05, 2008

This weekend our staff was hired as consultants to design and build a rail line in the nearby town of Patio. Ava Operating Company acquired Brio track and trains. Our challenge was to use all available equipment and inventory to create two independent loops of track and a trolly line in a space approximately 1 scale acre in size. The equipment is a little less than half size of O. The scale area is about 4 acres.

The solution was a two-level operation. This required construction of additional piers. A photo of the prototype will be attached to this post in the next few days. The prototype has been disasembled to improve the property.

No comments: