Wednesday, March 26, 2008

Order is starting to return.
The upper and lower loops are again functional. Wiring for the upper and lower loops now has dual feeds for consistent voltage delivery.

The upper loop now has a passenger terminal with lighting. The platform was extended to match the curve radius. The lighting is controlled remotely with an LED equiped toggle switch. Ava approves.

Significant utilitiy upgrades below grade include a new main power cut off and better wire management with labels. The power distribution block was upgraded from 8 to 16 terminals.

Roadbed on the lower loop upgraded from HO to O for a much better look.

The CNW NW switcher took a few rounds with little change in speed.

The coal dump car is still having trouble at switches. It will probably need a sliding shoe replacement.